Who is online
We have 1 guest online
Technical Rider “Lions of Africa” 2011
Input list:

Monitors:
Minimum 6 wedges (4 in front, 2 in the back) plus sidefills. Minimum 4 groups.
Additional information:
10 drums (with clipon mics) will be moved during the show from the front of the stage to the back of the stage (cable length!).
Stage:
We need a clean stage of at least 10m x 8m.
Backdrop:
If possible we like to put a backdrop (appr 8x6 m).
Fogmachine:
A fog machine is nessecary for our show. Preferably two on each side.
Stageplan:
















